Project Information
Final Contract: $4,186,141.00
Client: City of Sunrise
View Scope Details
Scope Of Work
Construction services to build two new passive park sites that expand 30 acres of new development, that included a disc golf course, 7,000 LF Flexipave pedestrian trail system, 1,000 LF of mulch trails, 3 restroom buildings, and 6 picnic pavilions, 11,000 SF playground area with shade structures, 2,300 SF Water play feature with decorative concrete surface and custom trellis. Site work included site preparation, earthwork, site utilities, sidewalks, elevated recycled plastic boardwalk thru wetland, parking lots, perimeter aluminum state fencing with masonry columns, dumpster area, park signs, site furniture, native landscaping, irrigation and modifications to littoral area include dredging and plaintive all native plants to create a wetland ecosystem.
As part of the work performed on the water was the reinforcing of existing sea wall and new seawall cap, complete new dock systems to include pilings, floating docks, and marina stations with water, sewer systems, electrical and fire service to service boats.